Our after sales department is an very important part of our department structures. After the customer receive steel materials, our after sales department will follow up regularly and solve problems for them in time if they have the needs. We romise to return the goods for free for its lifetime if it is quality of the steel material itself. Meanwhile, if you have any advice or complaints, also welcome to feed back to our after sales department, and we are trying to give better service to you.
When using ABS D36 offshore structural steel, low-alloy high-strength steel, it is desirable to take advantage of its high strength and use a thinner section, not only for saving weight but also for the economy as much as possible. However, the corrosion factor must be fully considered. The thinner the steel section, the more attention should be paid to corrosion protection. Some low-alloy high-strength steels have good atmospheric corrosion resistance, which can not only improve the effect of anti-corrosion coatings, but in some cases, take appropriate precautions and can even be used without being coated in the atmosphere.
"We can supply ABS D36 offshore structural steel, hot rolled pressure vessel plate available sizeThickness from 5mm to 150mm Width: from 1,500mm to 2,500mm Length: from 6,000mm to 12,000mmFor plates thinner than 40mm normally supply as rolled. Plates above 40mm thick are normalised.Technical conditions: Ultrasonic tested as per SA 578 or any other as per requirement ; MTC acc to EN 10204 / 3.2; Charpy Impact tested at -20/-46 DegC.; Furnace Normalised."
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.
Leave a Message