RINA AH36 offshore oil drilling platform steel Hot Rolled Structural Steel Plate

RINA AH36 offshore oil drilling platform steel Hot Rolled Structural Steel Plate

Weathering steel alloys like Corten A/B were developed for hard-wearing industrial applications to eliminate the need for costly finishing and refinishing. Primary alloying elements in the steel (copper, chromium, and nickel) actively cause atmospheric corrosion at the surface to generate a hard, corrosion-resistant patina. This protective layer actively and continuously regenerates when Corten steel RINA AH36 offshore oil drilling platform steel is subjected to weathering influences, including airborne pollutants, humidity, and rain.

Based on the main business of iron and steel, we are committed to producing high-quality, green and efficient steel products. The main steel products are medium and RINA AH36 offshore oil drilling platform steel heavy plate, hot rolled coil, section steel, steel tube, etc., which are widely used in automobile, oil, railway, bridge, construction, electricity, transportation, machinery, shipbuilding and other important fields. Our steel products are exported RINA AH36 offshore oil drilling platform steel to Indonesia, Bangladesh, Myanmar, Iran, Brazil, Mexico, UAE, Iraq, etc Egypt, Mozambique, Ukraine and other dozens of countries and regions.

RINA AH36 offshore oil drilling platform steel, Wear resistant steel plate cutting: plasma cutting, carbon arc, grinding wheel saw can be used to cut large area of steel plate into the required shape. In order to reduce the cold crack of wear-resistant steel plate cutting, the wear-resistant steel plate should be preheated when cutting. The thicker the wear-resistant steel plate is, the higher the hardness is, and the higher the corresponding preheating temperature is. The preheating temperature should not exceed 200.

After extrusion, the RINA AH36 offshore oil drilling platform steel tube shall be removed for sizing. The sizing machine uses a cone-shaped bit to rotate into the steel embryo at high speed to drill holes to form steel pipes. The inner diameter of the steel pipe is determined by the outer diameter length of the drill bit of the sizing machine. After sizing, the steel pipe will enter the cooling tower and be cooled by water spray. After cooling, the steel pipe will be straightened. After straightening, the steel pipe is sent to the metal flaw detector (or hydraulic test) by the conveyor belt for internal flaw detection.

From the order to the delivery, there are three quality inspections to ensure that the qualified rate of finished products is more than 100%. We promise that every order will be tracked in a timely manner to ensure that customers can receive goods safely and constantly listen to their opinions and suggestions, reflect on our own problems, and let customers feel at ease. We have a large warehouse in Shanghai and Tianjin, which can provide customers with sufficient sources of supply.

Leave a Message