Temperature has a great influence on the strength of the material, KD cable laying ship steel. When the temperature exceeds a certain value, the strength limit of the steel will be reduced. The higher the temperature, the lower the strength. In addition, the longer the steel is used at high temperature, the lower the strength. Therefore, if the steel works at high temperature for a long time, the instantaneous strength of the steel can not be used as its performance index, nor can the room temperature performance replace the high temperature performance.
For a ship, the choice of medium and thick ship plate is very important, it is an important part of the ship frame. The pressure bearing capacity of KD cable laying ship steel, medium and thick ship plates is very strong. Secondly, because it is a ship plate, it must be driven in water, so of course the corrosion resistance is better, otherwise it will bring danger to buyers. Moreover, the service life of the ship will be increased. Regular inspection of the ship plate can ensure the safety of sailing. You can also know whether the ship plate is defective, so you don't have to worry about water seepage when you sail.
Global KD cable laying ship steel crude steel production in March this year increased by 2.6 percent month on month and fell by six percent year on year to 147.1 million metric tons. accordina to the World Steel Association (worldsteel).In the first quarter of this year, global KD cable laying ship steel crude steel production decreased to 443.03 million mt, down 1.4 percent year on year.
The riser is an indispensable equipment in the development of offshore oil and gas resources, mainly for drilling, conducting liquid, conducting mud and transporting oil and gas. Because steel catenary risers face complex service conditions such as surges, seabed clay, and ice loads, they need to have high fatigue strength, large plastic deformation capacity, and excellent fracture toughness. At present, China's first self-developed and designed 6-inch steel catenary riser was successfully laid on August 18 this year in the first deep-water self-operated large gas field Lingshui 17-2 project.
Leave a Message