TMCP NV E engineering ship steel top manufacturer

TMCP NV E engineering ship steel top manufacturer

The difference between TMCP NV E engineering ship steel, hot rolled sheet and cold rolled sheet: hot rolled sheet has low hardness, easy processing and good ductility. The cold-rolled sheet has high hardness and relatively difficult processing, but it is not easy to deform and has high strength. The cold rolled sheet is mostly used in automobile manufacturing and electrical products. Therefore, the two have their own characteristics. According to these characteristics, it is more appropriate to choose the right rolled plate to maximize its effect and benefit.

We do sand blasting and shop primer for various TMCP NV E engineering ship steel steel plates such as carbon steel plates, high strength low alloy steel plates, shipbuilding steel plates, etc. before delivery, so as to protect the steel plates from going rust during transportation. Our sand blasting standard is SA2.5, and shop primer TMCP NV E engineering ship steel thickness is 20μm or so. Our shop primer has been certified by ABS, LR, BV etc. authorities.

TMCP NV E engineering ship steel, ASTM A131 shipbuilding steel has different grade levels. The ordinary strength shipbuilding steel grades are grade A/B/D/E. Their min. yield strength is 235 Mpa, and tensile strength is 400-520 Mpa. The higher strength shipbuilding steel grades are grade AH32/DH32/EH32/FH32, AH36/DH36/EH36/FH36 AH40/DH40/EH40/FH40. The min. yield strength of AH32/DH32/EH32/FH32 steel is 315 Mpa, and tensile strength is 440-590 Mpa. The min. yield strength of AH36/DH36/EH36/FH36 steel is 355 Mpa, and tensile strength is 490-620 Mpa. The min. yield strength of AH40/DH40/EH40/FH40 steel is 390 Mpa, and tensile strength is 510-650 Mpa.

When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.

Leave a Message