1/2 inch structural steel GL-A hot-rolled steel strip for sale

1/2 inch structural steel GL-A hot-rolled steel strip for sale

Hull structural steel is divided into general thickness and high-strength steel. General strength steel is divided into four grades of A, B, C and D; high-strength steel is divided into two strength grades and three quality grades; AH32, DH32, EH32, AH36, DH36, GL-A hot-rolled steel strip, EH36. In order to ensure quality and ensure sufficient toughness of hull structural steel, the chemical composition of Mn / C is required to be above 2.5, and the carbon equivalent is also strictly required. Our Hull structural steel plates can be supplied with certificates from different classification societies.

GL-A hot-rolled steel strip 2020 stock in Tianjin: 7*2920*8200, 32*3000*7440, 14*2150*9300, 16*2200*10000, 12.5*2900*11000, 7*2920*8200, 14*1950*11000, 80*2200*10000, 16*2230*7650, 7*2920*8780, 32*2900*9700, 20*1950*9550, 10*2200*7200, 23.1*2590*7790, 20*1400*11400, 20*1950*9700, 7*2920*8780, 20.9*2851*7000, 25*1600*9300, 30*2200*9000, 14*1950*10550, 30*1600*8600.

GL-A hot-rolled steel strip controlled rolling is that, on the basis of adjusting the chemical composition of GL-A hot-rolled steel strip, by controlling the heating temperature, rolling temperature, deformation system and other process parameters, the change law of austenite structure and the microstructure of phase transformation products are controlled, so as to achieve the purpose of refining the structure and improving the strength and toughness of GL-A hot-rolled steel strip.

When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.

Leave a Message